ADVANCEDVISION.NL ≡ Accessories 4 Women Live Offers: Never Seen Prices In End Of Season Sale. Shop Now!
  • Top Products For Builders

  • Cempolay Rapid 30

Cempolay Rapid 30

$11.51 $20.95
Bostik Cempolatex Rapid 30 further informationCoverage:Approx. 5m2 at 2mm thickness per 16kg bagApprox. 2m2 at 5mm thickness per 16kg bagBostik Cempolatex Rapid 30 is a high strength, polymer modified, cementitious underlayment for smoothing uneven floors prior to laying decorative floor coverings. It can be laid over most common substrates including: cementitious screeds, concrete floors, calcium sulphate screeds and other strong, rigid subfloors.It is protein-free so may be used in biologically sensitive installations. It should always be covered with a floor covering.Suitable for use with warm water underfloor heating installations provided a maximum surface temperature of 27°C is not exceeded. The heating must be switched off at least 48 hours before and after application.For radiant underfloor heating systems, please consult Technical Services.Bostik Cempolatex Rapid 30 should only be used on subfloors protected from moisture from the ground and residual construction moisture. Do not use prior to applying surface DPM’s. It is not recommended for use over old adhesive residues. Please contact Bostik technical services for the appropriate smoothing compound.Bostik Cempolatex Rapid 30 product characteristicsFormDry, free flowing powderColourCreamCompositionCement/polymerCement/polymerCement/polymerCement/polymerStore for up to 6 months from date of manufacture when stored in original, unopened packaging clear of the ground and under cool, dry conditions. Protect from damp, condensation, dew, etc.Bostik Cempolatex Rapid 30 typical performance dataGauging liquidWaterApplication Temperature 5°C to 25°CCoverageApprox. 5m2 at 2mm thickness per 16kg bag Approx. 2m2 at 5mm thickness per 16kg bagApplication Thickness2mm to 10mmWorking Time5-10 minutes approx. after mixingDrying TimesFoot traffic: 30 minutes approx. at 3mm thickness at 20°C Loose lay flooring coverings: 45 minutes approx. at 20°C Floor coverings: 3 hours approx. ( Note: Drying/covering times will be extended at lower temperatures.Compressive Strength>30 N/mm2 at 28 days</td></tr></tbody></table><h4>DIRECTIONS FOR USE</h4><p>IMPORTANT: Before using Bostik Cempolatex Rapid 30, refer to the relevant Health & Safety Data Sheet, available at www.bostik.com/uk.</p><h4>PREPARATION</h4><p>1. Ensure the subfloor is clean, sound, dry and free from laitance, cracks, structural defects and conforms to BS 8102: Code of Practice for protection of structures against water from the ground. Subfloors should be tested for residual construction moisture. For readings above 75% RH a suitable Bostik surface membrane must be used.</p><p>2. Any contaminants that may hinder adhesion, such as grease, dust, some curing compounds and adhesive residues must be completely removed.</p><h4>PRIMING</h4><p>3. In all cases the subfloor must be primed prior to application of the smoothing compound as shown in the table below. Follow the instructions of the specific primer container and technical data sheet for application and drying details.</p><h4>Bostik Cempolatex Rapid 30 substrates</h4><table id="tablepress-699" class="tablepress tablepress-id-699"><tbody class="row-striping row-hover"><tr class="row-1"><td class="column-1">Absorbent substrates:</td><td class="column-2">Bostik Cempolay Universal Primer (diluted 1:2 with water)</td></tr><tr class="row-2"><td class="column-1">Dense/non- absorbent substrates including epoxy membranes:</td><td class="column-2">Bostik Cempolay Universal Primer neat</td></tr><tr class="row-3"><td class="column-1">Calcium sulphate screeds:</td><td class="column-2">Consult Technical Services</td></tr><tr class="row-4"><td class="column-1">Radiant underfloor heating systems:</td><td class="column-2">Bostik Screedmaster Epoxy Primer</td></tr></tbody></table><h4>MIXING</h4><ol><li>Pour 3.2 litres of cold, clean water into a clean mixing bucket. Gradually add the 16kg bag of Bostik Cempolatex Rapid 30 powder to the water whilst continually mixing with an electric drill and mixing paddle until a smooth lump-free mixture is obtained. This will normally be achieved after 2 minutes and not before. Do not under mix. Use the mixture immediately.</li><li>Based on good ambient conditions of 20oC the product will remain workable for approximately 5-10 minutes after mixing.</li><li>If the mix stiffens before it has been spread, it must be discarded. Do not add further water or liquid.</li></ol><h4>APPLICATION</h4><ol start="4"><li>Pour the mixed material onto the floor. Using a smooth edge steel trowel, smooth over the wet product to gain the desired heights and smooth surface texture.</li><li>Bostik Cempolatex Rapid 30 can be spike-rollered to improve the surface finish if desired. This should be done shortly after application whilst Bostik Cempolatex Rapid 30 is still fluid. Do not spike roller once the product has begun to gel or set as this will create imperfections.</li><li>On large projects, it is advisable to work in teams of 2 to ensure applications to existing wet edges can be maintained.</li><li>If a second application of Bostik Cempolatex Rapid 30 is required, this can be carried out after approximately 45 minutes. Prime the first layer with <a href="https://buythepallet.co.uk/product/bostik-cempolay-universal-primer-bulk-buy/">Bostik Cempolatex Universal Primer</a> (diluted 1:2 with water), allow the primer to dry.</li></ol><h4>APPLICATION THICKNESS</h4><p>8. Generally, a depth of 2mm to 10mm is permissible except for non-absorbent subfloors such as surface DPMs, which require a minimum of 3mm of Bostik Cempolatex Rapid 30 to ensure adequate absorbency for subsequent adhesives.</p><h4>DRYING TIMES</h4><ol start="9"><li>Based on good ambient conditions of 20°C the product will remain workable for approximately 10 minutes after mixing.</li><li>It will take light foot traffic after 30 minutes and will be ready to receive loose floor coverings in as little as 45 minutes.</li><li>The product should be protected from strong sunlight and through draughts as this can dehydrate the product resulting in incorrect curing.</li></ol><h4>Bostik Cempolatex Rapid 30 traffic</h4><table id="tablepress-700" class="tablepress tablepress-id-700"><tbody class="row-striping row-hover"><tr class="row-1"><td class="column-1">Foot traffic:</td><td class="column-2">30 minutes approx. (<5mm thickness) at 20°C30 N/mm2 at 28 daysDIRECTIONS FOR USEIMPORTANT: Before using Bostik Cempolatex Rapid 30, refer to the relevant Health & Safety Data Sheet, available at www.bostik.com/uk.PREPARATION1. Ensure the subfloor is clean, sound, dry and free from laitance, cracks, structural defects and conforms to BS 8102: Code of Practice for protection of structures against water from the ground. Subfloors should be tested for residual construction moisture. For readings above 75% RH a suitable Bostik surface membrane must be used.2. Any contaminants that may hinder adhesion, such as grease, dust, some curing compounds and adhesive residues must be completely removed.PRIMING3. In all cases the subfloor must be primed prior to application of the smoothing compound as shown in the table below. Follow the instructions of the specific primer container and technical data sheet for application and drying details.Bostik Cempolatex Rapid 30 substratesAbsorbent substrates:Bostik Cempolay Universal Primer (diluted 1:2 with water)Dense/non- absorbent substrates including epoxy membranes:Bostik Cempolay Universal Primer neatCalcium sulphate screeds:Consult Technical ServicesRadiant underfloor heating systems:Bostik Screedmaster Epoxy PrimerMIXINGPour 3.2 litres of cold, clean water into a clean mixing bucket. Gradually add the 16kg bag of Bostik Cempolatex Rapid 30 powder to the water whilst continually mixing with an electric drill and mixing paddle until a smooth lump-free mixture is obtained. This will normally be achieved after 2 minutes and not before. Do not under mix. Use the mixture immediately.Based on good ambient conditions of 20oC the product will remain workable for approximately 5-10 minutes after mixing.If the mix stiffens before it has been spread, it must be discarded. Do not add further water or liquid.APPLICATIONPour the mixed material onto the floor. Using a smooth edge steel trowel, smooth over the wet product to gain the desired heights and smooth surface texture.Bostik Cempolatex Rapid 30 can be spike-rollered to improve the surface finish if desired. This should be done shortly after application whilst Bostik Cempolatex Rapid 30 is still fluid. Do not spike roller once the product has begun to gel or set as this will create imperfections.On large projects, it is advisable to work in teams of 2 to ensure applications to existing wet edges can be maintained.If a second application of Bostik Cempolatex Rapid 30 is required, this can be carried out after approximately 45 minutes. Prime the first layer with Bostik Cempolatex Universal Primer (diluted 1:2 with water), allow the primer to dry.APPLICATION THICKNESS8. Generally, a depth of 2mm to 10mm is permissible except for non-absorbent subfloors such as surface DPMs, which require a minimum of 3mm of Bostik Cempolatex Rapid 30 to ensure adequate absorbency for subsequent adhesives.DRYING TIMESBased on good ambient conditions of 20°C the product will remain workable for approximately 10 minutes after mixing.It will take light foot traffic after 30 minutes and will be ready to receive loose floor coverings in as little as 45 minutes.The product should be protected from strong sunlight and through draughts as this can dehydrate the product resulting in incorrect curing.Bostik Cempolatex Rapid 30 trafficFoot traffic:30 minutes approx. (Loose floor coverings45 minutes approx. (Floor coverings:3 hours approx. ( thickness) at 20°CCOVERAGE12. Approx. 4m-5m2 at 2mm thickness per 16kg bag13. Approx. 2.m2 at 5mm thickness per 16kg bagCLEANING14. Clean tools and equipment immediately after use with warm, soapy water, whilst the product is still wet.PRECAUTIONS IN USEFor any application not covered please contact Technical Services on 44 (0) 1785 272625 or visit www.bostik.com/uk for advice.Recommendations and suggestions are for guidance only, since conditions of use are completely beyond our control.For health and safety instruction, first aid measures and spillage and disposal instructions, see separate Health and Safety Data Sheet for Bostik Cempolatex Rapid 30. Categories: All Products, Floor Levelling Compounds - Pallet Deals, Smoothing Compounds - Pallet Deals
Top Products For Builders

Top Products For Builders

  • SikaFloor 245 Deep Fill Ultra
    $14.35 $18.94
  • Ronadeck Resin Bound Surfacing Resin – Two Part A B 7.5Kg Polyurethane
    $11.68 $17.52
  • SikaFloor 131 Level Latex Ultra
    $21.61 $42.57
  • CLICK HERE TO BUY AS MANY AS YOU WANT HERE
    $22.84 $38.37
  • RonaScreed FastDry Prompt
    $22.53 $41
  • Distressed Olive Wood
    $19 $27.36
  • SikaFloor 440 Fibre Reinforced
    $15.04 $21.66
  • IBRAN-X Grass Parking Grids – Mesh Grids
    $29.04 $56.34
  • Cempolay Rapid 30
    $11.51 $20.95
  • Cempolatex 1 Pack Latex Sub-Floor Levelling
    $19.37 $27.7
  • Arditex NA Pallet Deals – 20Kg bag 4.85Kg bottle – 2-Part Ultra Rapid Setting Latex Subfloor Levelling and Smoothing Compound – GREY – ( Ardex NA )
    $23.72 $40.8
  • Ronadeck Resin Bound Surfacing Aggregates Kits – For Driveways, Pathways, Gravel Areas
    $28.06 $35.08
  • Boiled Linseed Oil
    $34.17 $47.5
  • Ultraplan Maxi 3230 Ultra-Fast Drying
    $16.08 $19.3
  • Kerakoll Proflow Trade
    $19.41 $26.98
  • Cempolay Ultra Strong
    $21.81 $30.97

© 2026 - ADVANCEDVISION.NL